Logo

UNITED TRACTORS

member of Astra

Service Tanjung Enim

MTBU / BTSJ

List Pekerjaan

Daftar pekerjaan yang sudah terinput

+ Tambah Job

Search & Filter

Klik untuk tampilkan atau sembunyikan filter

Tanggal

Senin,
11 Mei 2026

Customer

-

Detail Unit

EX61
HM : 1531 hours
KM : -1 km

Pekerjaan

PMP PS1 HM 1500
  • PMP PS1 HM 1500

Time Record

🚚 Depart 10:30
📍 Arrive 11:00
🔧 Start 11:30
✅ Finish 14:00
Ready (RFU)

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Dendi Herianto
Resada Peranginangin

Status

Ready (RFU)

Tanggal

Senin,
11 Mei 2026

Customer

Aiti Mitra Utama

Detail Unit

EX63
PC350LC-8M2
S/N : C92725
HM : 661 hours

Pekerjaan

TROUBLESHOOTING
  • - Preparation
  • - Traveling
  • - T/S Error return filter hyd clogging
  • - Check Filter Hyd ( OK )
  • - Check Sensor ( OK )
  • - Level oil HYD ( OK )
  • - Ground test
  • - Final inspection
  • - Krida area kerja
  • - Reporting

Time Record

🚚 Depart 10:00
📍 Arrive 11:00
🔧 Start 11:00
✅ Finish 14:30
Ready (RFU)

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Jefri Sukoco
Aldo Trilian Alhadi
Firdaus

Status

Ready (RFU)

Tanggal

Minggu,
10 Mei 2026

Customer

-

Detail Unit

EX26-B
HM : 35 hours

Pekerjaan

Completed & Delivery Unut
  • install mirror
  • completed
  • delivery unit
  • ground test

Time Record

🚚 Depart 00:00
📍 Arrive 10:00
🔧 Start 10:00
✅ Finish 15:30
Ready (RFU)

Lokasi

BTSJ (Banko Tengah Suban Jeriji)

Manpower

Jefri Sukoco
Aldo Trilian Alhadi

Status

Ready (RFU)

Tanggal

Minggu,
10 Mei 2026

Customer

Pamapersada Nusantara

Detail Unit

DZ669
D375A-6R/P2
S/N : 66356
SAA6D170E-5
E/SN : 617008
HM : 3603 hours

Pekerjaan

TROUBLESHOOTING
  • - Prepare
  • - Traveling
  • - Check Visual waterpump ( not ok )
  • - Remove Waterpump old
  • - install waterpump new
  • - fill coolant
  • - Completed
  • - Test running
  • - final inspection
  • - Krida area

Time Record

🚚 Depart 08:30
📍 Arrive 09:00
🔧 Start 09:00
✅ Finish 16:00
Ready (RFU)

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Warijan
Firdaus
Riyan Rivaldi
Sultansyah Hakim

Status

Ready (RFU)

Tanggal

Sabtu,
09 Mei 2026

Customer

Sumber Niaga Utama Jaya

Detail Unit

CP05-B
BW220D-5
S/N : 961587611203
TCD2012L0612V
E/SN : 13087262

Pekerjaan

OVH
  • - Preparation
  • - Traveling
  • - Remove Frame Travel
  • - Diassy and ispeksi bearing travel
  • - Temuan kedua bearing dalam keadaan rusak (harus di ganti)
  • - Diassy Exciter and check bearing ( secara visual masih bisa dipake ulang)
  • - spacer bearing harus di ganti
  • - wraping component and move to warehouse
  • - krida area ws TJE

Time Record

🚚 Depart 07:00
📍 Arrive 07:00
🔧 Start 08:00
✅ Finish 17:00
Not Completed

Lokasi

TJE (Tanjung Enim)

Manpower

Jaya Pranata
Firdaus
Jefri Andi

Status

Not Completed

Tanggal

Sabtu,
09 Mei 2026

Customer

Aiti Mitra Utama

Detail Unit

CP22
BW211D-40/P7
S/N : 961884301748
BF4M2012C
E/SN : 12776984
HM : 15003 hours

Pekerjaan

PPM
  • Preparation
  • Travelling
  • Waiting unit PS
  • Take data & backlog
  • PPM
  • Final inspection
  • Groundtest

Time Record

🚚 Depart 13:10
📍 Arrive 13:25
🔧 Start 13:30
✅ Finish 16:00
Ready (RFU)

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Ali Wardana Batubara
Muhammad Gilang

Status

Ready (RFU)

Tanggal

Jumat,
08 Mei 2026

Customer

Sumber Niaga Utama Jaya

Detail Unit

CP05-B
BW220D-5
S/N : 961587611203
TCD2012L0612V
E/SN : 13087262

Pekerjaan

OVH EXCITER
  • - Preparation
  • - Traveling
  • - Remove Bolt mounting Exiter LH
  • - Remove exiter LH
  • - Waiting alat angkat CT sampai 16:00
  • - Move Exiter To LV
  • - Krida area

Time Record

🚚 Depart 08:15
📍 Arrive 08:30
🔧 Start 08:30
✅ Finish 16:30
Not Completed

Lokasi

BTSJ (Banko Tengah Suban Jeriji)

Manpower

Jaya Pranata
Dio Prayoga
Firdaus

Status

Not Completed

Tanggal

Jumat,
08 Mei 2026

Customer

Aiti Mitra Utama

Detail Unit

CP21
BW211D-40/P7
S/N : 961884301747
BF4M2012C
E/SN : 12777004
HM : 15011 hours

Pekerjaan

PPM
  • - Preparation
  • - Travelling
  • - Take data unit
  • - PPM
  • - Take backlog
  • - Final inspection
  • - Groundtest

Time Record

🚚 Depart 13:15
📍 Arrive 13:25
🔧 Start 13:30
✅ Finish 16:10
Ready (RFU)

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Ali Wardana Batubara
Jefri Andi
Muhammad Gilang

Status

Ready (RFU)

Tanggal

Kamis,
07 Mei 2026

Customer

-

Detail Unit

-

Pekerjaan

Delivery komponen / part
  • -

Time Record

🚚 Depart 15:20
📍 Arrive 15:21
🔧 Start 15:23
✅ Finish 16:21
Ready (RFU)

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Ayi Pranata
Dwi Putra Ramadhandy

Status

Ready (RFU)

Tanggal

Kamis,
07 Mei 2026

Customer

Pamapersada Nusantara

Detail Unit

DZ1361
D155A-6/P1
S/N : J10114
SAA6D140E-5
E/SN : 641068
HM : 7268 hours

Pekerjaan

PAP FD LH/RH SOS
  • Preparation
  • Take EMILA
  • Take Sample
  • Check Leak FD LH/RH (OK)

Time Record

🚚 Depart 07:00
📍 Arrive 07:00
🔧 Start 07:00
✅ Finish 09:00
Monitoring

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Ali Wardana Batubara
Riyan Rivaldi

Status

Monitoring

Tanggal

Kamis,
07 Mei 2026

Customer

Pamapersada Nusantara

Detail Unit

DZ588
D375A-6R/P2
S/N : 65814
SAA6D170E-5
E/SN : 614816
HM : 33983 hours

Pekerjaan

PAP TM SOS
  • Preparation
  • Take EMILA
  • Take Sample TM

Time Record

🚚 Depart 07:00
📍 Arrive 07:00
🔧 Start 07:00
✅ Finish 09:00
Monitoring

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Ali Wardana Batubara
Riyan Rivaldi

Status

Monitoring

Tanggal

Rabu,
06 Mei 2026

Customer

Atisi Tangkas Madani

Detail Unit

DZ26
D85E-SS-2/P8
S/N : J21870
S6D125E-2
E/SN : 127164
HM : 454 hours

Pekerjaan

PERIODICAL SERVICE
  • Preparation
  • Travelling
  • Waiting unit
  • PS500H
  • Final inspection
  • Groundtest

Time Record

🚚 Depart 14:00
📍 Arrive 14:25
🔧 Start 15:10
✅ Finish 16:30
Ready (RFU)

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Muhammad Gilang
Sultansyah Hakim

Status

Ready (RFU)

Tanggal

Selasa,
05 Mei 2026

Customer

Pamapersada Nusantara

Detail Unit

Dz669
D375A-6R/P2
S/N : 66356
SAA6D170E-5
E/SN : 617008

Pekerjaan

Ri pivot
  • * install hose tilt cylinder
  • * torque bolt cap turnion
  • * install catwalk LH RH
  • * install bolt mounting pin equalizer bar
  • * install bolt guard sprocket bagian bawah
  • * cabut bolt patah & install cap mounting track roller RH bagian dalam,dan install
  • * final cek
  • * bapp

Time Record

🚚 Depart 07:30
📍 Arrive 08:00
🔧 Start 08:00
✅ Finish 15:00
Ready (RFU)

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Dendi Herianto
Ayi Pranata
Dwi Putra Ramadhandy
Muhammad Gilang

Status

Ready (RFU)

Tanggal

Senin,
04 Mei 2026

Customer

Pamapersada Nusantara

Detail Unit

Dz669
D375A-6R/P2
S/N : 66356
SAA6D170E-5
E/SN : 617008

Pekerjaan

Ri pivot
  • 1.clean pivot area
  • 2.install rabber pivot
  • 3
  • install track framelh,rh
  • 4.install teleskocit lh rh

Time Record

🚚 Depart 07:30
📍 Arrive 07:30
🔧 Start 08:00
✅ Finish 17:25
Not Completed

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Dendi Herianto
Resada Peranginangin
Dwi Putra Ramadhandy

Status

Not Completed

Tanggal

Senin,
04 Mei 2026

Customer

-

Detail Unit

cp 005-B

Pekerjaan

Remove exiter LH
  • reposisi unit
  • stand unit
  • remove vibro motor
  • check plate vibro motor (vibro motor leak)
  • check bearing retainer (rusak
  • bolt patah)
  • remove frame LH
  • krida area

Time Record

🚚 Depart 07:25
📍 Arrive 07:30
🔧 Start 07:35
✅ Finish 16:35
Not Completed

Lokasi

BTSJ (Banko Tengah Suban Jeriji)

Manpower

Ali Wardana Batubara
Aldo Trilian Alhadi
Dio Prayoga

Status

Not Completed

Tanggal

Sabtu,
02 Mei 2026

Customer

-

Detail Unit

EX66
HM : 21 hours

Pekerjaan

INSPECTION CYLINDER BUCKET
  • - Preparation & travelling
  • - Measurement cylinder bucket drift
  • - Actual pengukuran
  • → Pengukuran awal 186 cm
  • → Menjadi 174 cm → Drift 13 cm
  • - Standar measurement drif (15mnt - 60cm)
  • - Take data
  • - Reporting

Time Record

🚚 Depart 08:10
📍 Arrive 08:25
🔧 Start 08:31
✅ Finish 10:55
Ready (RFU)

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Ali Wardana Batubara
Muhammad Gilang

Status

Ready (RFU)

Tanggal

Sabtu,
02 Mei 2026

Customer

-

Detail Unit

EX66
HM : 21 hours

Pekerjaan

Cylinder Bucket Drift
  • Preparation
  • Measure Hydraulic Drift
  • before : 186 cm
  • after 15m : 173 cm
  • drift : 13 cm STD : <60 cm (OK)
  • check bucket cylinder relief (OK)

Time Record

🚚 Depart 08:00
📍 Arrive 08:00
🔧 Start 08:00
✅ Finish 10:30
Monitoring

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Ali Wardana Batubara
Muhammad Gilang

Status

Monitoring

Tanggal

Rabu,
29 April 2026

Customer

Aiti Mitra Utama

Detail Unit

EX22-B
PC350LC-8M2
S/N : C92547
SAA6D114E-3
E/SN : 26896615

Pekerjaan

Reflace front seal
  • Remove old seal
  • Cleaning area front seal
  • Install new seal
  • Completed V belt
  • Completed area engine
  • Test running
  • Check blowby and check leak (OK)
  • Completed and final check

Time Record

🚚 Depart 00:00
📍 Arrive 08:45
🔧 Start 08:50
✅ Finish 17:20
Ready (RFU)

Lokasi

BTSJ (Banko Tengah Suban Jeriji)

Manpower

Dedi Edison
Ali Wardana Batubara
Jefri Andi
Zandika Afdilla

Status

Ready (RFU)

Tanggal

Rabu,
29 April 2026

Customer

-

Detail Unit

GR 583
HM : 19971 hours

Pekerjaan

COMBISIONIG TRANSMISI
  • - Preparation
  • - Traveling
  • - Waiting Unit running progress backlog Pama
  • - Combisioning Transmisi New
  • - Take Data pengecekan Oil Level DLL
  • - PPM T/M
  • - Finish
  • - Reporting

Time Record

🚚 Depart 13:00
📍 Arrive 13:00
🔧 Start 14:00
✅ Finish 15:00
Ready (RFU)

Lokasi

BTSJ (Banko Tengah Suban Jeriji)

Manpower

Aldo Trilian Alhadi
Firdaus

Status

Ready (RFU)

Tanggal

Selasa,
28 April 2026

Customer

Atisi Tangkas Madani

Detail Unit

DZ25
D85E-SS-2/P8
S/N : J21811
S6D125E-2
E/SN : 126985
HM : 1080 hours

Pekerjaan

Service 1000
  • Preparation
  • Traveling
  • Ps 1000
  • Final check
  • Finish

Time Record

🚚 Depart 13:05
📍 Arrive 13:30
🔧 Start 13:45
✅ Finish 17:10
Ready (RFU)

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Ayi Pranata
Dio Prayoga
Muhammad Gilang
Zandika Afdilla

Status

Ready (RFU)

Tanggal

Senin,
27 April 2026

Customer

-

Detail Unit

GS 872
HM : 29759 hours

Pekerjaan

OVERHAUL ( NIGHT SHIFT )
  • - preparation
  • - traveling
  • - prepare running
  • - check oil level engine ( ok )
  • - check coolant level ( ok )
  • - priming fuel
  • - replace filter oil
  • - fill oil to filter oil engine
  • - tes crank
  • - running
  • - cek kebocoran ( ok )
  • - final inspection ( ok )
  • - Krida area kerja

Time Record

🚚 Depart 20:00
📍 Arrive 20:00
🔧 Start 20:00
✅ Finish 02:00
Ready (RFU)

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Warijan
Firdaus

Status

Ready (RFU)

Tanggal

Minggu,
26 April 2026

Customer

-

Detail Unit

Gs 872

Pekerjaan

Ovh GS 872
  • Preperation
  • Travelling
  • Top engine 1:6
  • Remove Fip oll
  • Canibal piping priming pump fip old to fip new
  • Install Fip new
  • Completed related fip
  • Replace front seal
  • Install tension pulley v belt
  • Install drive pullew alternator
  • Install alrenator
  • Replace hose lubricating turbo
  • Install Fan
  • Krida area kerja

Time Record

🚚 Depart 20:00
📍 Arrive 20:30
🔧 Start 20:30
✅ Finish 04:00
Not Completed

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Warijan
Ayi Pranata
Firdaus
Muhammad Gilang

Status

Not Completed

Tanggal

Sabtu,
25 April 2026

Customer

-

Detail Unit

GS 872

Pekerjaan

OVERHAUL GS872 ( NIGHT SHIFT )
  • - Preparation
  • - Traveling
  • - completed cylinder head
  • - install injector
  • - install rocker arm
  • - adjust valve clearance
  • - regasket cover rocker arm
  • - install cover rocker
  • - torque bolt mounting rocker arm
  • - tab bolt mounting suction water pump
  • - torque bolt mounting suction pump
  • - reoring piping DISCHARGE Waterpump
  • - install piping DISCHARGE waterpump
  • - torque bolt mounting DISCHARGE waterpump
  • -krida area kerja

Time Record

🚚 Depart 20:00
📍 Arrive 20:30
🔧 Start 20:30
✅ Finish 04:00
Not Completed

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Warijan
Firdaus
Muhammad Gilang

Status

Not Completed

Tanggal

Jumat,
24 April 2026

Customer

-

Detail Unit

GS872

Pekerjaan

OVERHAUL
  • - Preparation
  • - Traveling
  • - Remove Cylinder Head 6x
  • - Cleaning 6x cylinder head
  • - Remove Thermostat
  • - Install Waterpump
  • - torque bolt mounting water pump
  • - Cleaning Gasket old di piping coolant
  • - Install Hose intake
  • - Krida Area kerja

Time Record

🚚 Depart 20:00
📍 Arrive 20:30
🔧 Start 20:30
✅ Finish 05:00
Not Completed

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Warijan
Firdaus
Muhammad Gilang

Status

Not Completed

Tanggal

Jumat,
24 April 2026

Customer

Pamapersada Nusantara

Detail Unit

GR702
GD955-7R/P2
S/N : 50008
SAA6D140E-5
E/SN : 639889
HM : 11045 hours

Pekerjaan

TS Steering system error DB3RKR
  • - continue check voltage CAN
  • - remove connector LST1
  • SAS
  • LST6
  • TM40
  • SL1
  • - cek ground fault in CAN circuit ( NOK)
  • - remove Joystick CAN controller
  • - completed cover & console LH

Time Record

🚚 Depart 08:00
📍 Arrive 08:00
🔧 Start 08:00
✅ Finish 16:30
Not Completed

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Ali Wardana Batubara
Sultansyah Hakim

Status

Not Completed

MENU