Tanggal

Rabu,
01 April 2026

Customer

Pamapersada Nusantara

Detail Unit

GR582
GD825A-2/P4
S/N : 13429
S6D140E-2
E/SN : 43882
HM : 19957 hours

Pekerjaan

Ovh Artic
  • Prepare hose front frame
  • Remove 2x accumulator assy' cyl blade lift
  • Remove brake valve
  • Reseal brake valve
  • Install brake valve & completed
  • Replace hose brake
  • Cleaning hose line wiper

Time Record

🔧 Start 08:00
✅ Finish 16:30
Continue

Lokasi

BTSJ (Banko Tengah Suban Jeriji)

Manpower

Warijan
Dio Prayoga
Sultansyah Hakim

Status

Continue

Tanggal

Rabu,
01 April 2026

Customer

Pamapersada Nusantara

Detail Unit

GR654
GD825A-2/P4
S/N : 13705
S6D140E-2
E/SN : 44896
HM : 5270 hours

Pekerjaan

TS ALTERNATOR LOW VOLTAGE
  • Preparation
  • Traveling
  • TS ALTERNATOR LOW VOLTAGE
  • Final Inspection
  • Finish

Time Record

🔧 Start 14:45
✅ Finish 16:15
Ready (RFU)

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Ali Wardana Batubara
Hangger Oktavian Margiansyah (UT School)

Status

Ready (RFU)

Tanggal

Rabu,
01 April 2026

Customer

Pamapersada Nusantara

Detail Unit

GR654
GD825A-2/P4
S/N : 13705
S6D140E-2
E/SN : 44896
HM : 5270 hours

Pekerjaan

TS TURBO LEAK
  • Preparation
  • Traveling
  • Take EMILA
  • TS TURBO LEAK
  • Final Inspection
  • Finish

Time Record

🔧 Start 14:45
✅ Finish 16:15
Ready (RFU)

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Ali Wardana Batubara
Hangger Oktavian Margiansyah (UT School)

Status

Ready (RFU)

Tanggal

Selasa,
31 Maret 2026

Customer

-

Detail Unit

Cp03

Pekerjaan

Ovh exiter
  • Unloading component
  • Remove frame travel motor
  • Remove travel motor
  • Remove bearing travel motor
  • Cleaning area kerja

Time Record

🚚 Depart 07:00
📍 Arrive 07:15
🔧 Start 07:30
✅ Finish 17:00
Continue

Lokasi

TJE (Tanjung Enim)

Manpower

Jaya Pranata
Jefri Andi
Riyan Rivaldi

Status

Continue

Tanggal

Selasa,
31 Maret 2026

Customer

Pamapersada Nusantara

Detail Unit

GR582
GD825A-2/P4
S/N : 13429
S6D140E-2
E/SN : 43882
HM : 19957 hours

Pekerjaan

OVH Artic
  • Rehose line steering wheel
  • Reoring Hyd pump
  • Reoring transmision pump
  • Install & completed control valve transmisi
  • Replace hose supply circle motor
  • Replace hose to swivel joint line power tilt

Time Record

🔧 Start 08:00
✅ Finish 16:30
Continue

Lokasi

BTSJ (Banko Tengah Suban Jeriji)

Manpower

Warijan
Dio Prayoga
Sultansyah Hakim

Status

Continue

Tanggal

Senin,
30 Maret 2026

Customer

-

Detail Unit

CP-03B

Pekerjaan

Remove Exciter
  • Remove front frame
  • Remove side frame LH RH
  • remove travel motor assy
  • Remove exciter lh rh assy
  • Moved component to TJE

Time Record

🔧 Start 08:00
✅ Finish 16:45
Continue

Lokasi

BTSJ (Banko Tengah Suban Jeriji)

Manpower

Jefri Sukoco
Ayi Pranata
Riyan Rivaldi

Status

Continue

Tanggal

Senin,
30 Maret 2026

Customer

Pamapersada Nusantara

Detail Unit

GR582
GD825A-2/P4
S/N : 13429
S6D140E-2
E/SN : 43882

Pekerjaan

Ovh Artic
  • Continue Re-hose area Transmisi& Hyd Pump

Time Record

🔧 Start 08:00
✅ Finish 16:30
Continue

Lokasi

BTSJ (Banko Tengah Suban Jeriji)

Manpower

Warijan
Dio Prayoga
Hangger Oktavian Margiansyah (UT School)

Status

Continue

Tanggal

Minggu,
29 Maret 2026

Customer

Sumber Niaga Utama Jaya

Detail Unit

CP03-B
BW211D-40
S/N : 961884301996
BF4M2012C
E/SN : 12825844

Pekerjaan

OVH Exciter
  • Prepare stand unit
  • Stand unit
  • Remove bolt frame LH and RH

Time Record

🔧 Start 07:30
✅ Finish 16:00
Continue

Lokasi

BTSJ (Banko Tengah Suban Jeriji)

Manpower

Jefri Sukoco
Riyan Rivaldi

Status

Continue

Tanggal

Minggu,
29 Maret 2026

Customer

-

Detail Unit

PC400

Pekerjaan

Cleaning shoe
  • Cleaning Shoe pc400
  • Loading komponen to CT

Time Record

🔧 Start 08:00
✅ Finish 16:00
Ready (RFU)

Lokasi

TJE (Tanjung Enim)

Manpower

Warijan

Status

Ready (RFU)

Tanggal

Kamis,
26 Maret 2026

Customer

TRAKA

Detail Unit

DZ17-B
D85E-SS-2
S/N : J21700
S6D125E-2
E/SN : 126792
HM : 1297 hours

Pekerjaan

Troubleshooting transmisi overheat
  • Preparation
  • Traveling
  • Troubleshooting transmisi overheat
  • Ground test
  • Final inspection
  • Finish

Time Record

🚚 Depart 01:30
📍 Arrive 02:15
🔧 Start 02:15
✅ Finish 04:00
Ready (RFU)

Lokasi

BTSJ (Banko Tengah Suban Jeriji)

Manpower

Jaya Pranata
Hangger Oktavian Margiansyah (UT School)

Status

Ready (RFU)

Tanggal

Rabu,
25 Maret 2026

Customer

-

Detail Unit

DZ375

Pekerjaan

Install shoe
  • Preparation
  • Traveling
  • +Derajat
  • Gulung track
  • Finish

Time Record

🔧 Start 07:30
✅ Finish 16:15
Ready (RFU)

Lokasi

TJE (Tanjung Enim)

Manpower

Warijan
Jefri Andi
Muhammad Gilang
Zandika Afdilla

Status

Ready (RFU)

Tanggal

Rabu,
25 Maret 2026

Customer

-

Detail Unit

DZ375

Pekerjaan

Install shoe
  • Preparation
  • Traveling
  • Gelar link
  • Cleaning ling
  • Cleaning shoe
  • Instal shoe To ling
  • Finish

Time Record

🔧 Start 07:30
✅ Finish 16:15
Continue

Lokasi

TJE (Tanjung Enim)

Manpower

Warijan
Jefri Andi
Muhammad Gilang
Zandika Afdilla

Status

Continue

Tanggal

Selasa,
24 Maret 2026

Customer

-

Detail Unit

D155

Pekerjaan

Remove & Instal
  • Preparation
  • Traveling
  • Remove recoil spring
  • Install recoil spring To frame
  • Final ispection
  • Finish

Time Record

🔧 Start 08:00
✅ Finish 16:30
Ready (RFU)

Lokasi

TJE (Tanjung Enim)

Manpower

Warijan
Jefri Andi
Zandika Afdilla

Status

Ready (RFU)

Tanggal

Selasa,
24 Maret 2026

Customer

-

Detail Unit

D375

Pekerjaan

Remove & Install
  • Preparation
  • Traveling
  • Torqe
  • +Derajat

Time Record

🔧 Start 08:00
✅ Finish 16:30
Continue

Lokasi

TJE (Tanjung Enim)

Manpower

Warijan
Jefri Andi
Zandika Afdilla

Status

Continue

Tanggal

Senin,
23 Maret 2026

Customer

-

Detail Unit

-

Pekerjaan

Remove and instal
  • Preparation
  • Remove Recoil spring old from track frame D155 RH
  • Instal new recoil spring to track frame D155 RH
  • Remove idler from track frame LH
  • Cleaning track frame LH
  • Krida
  • Finish

Time Record

🔧 Start 07:45
✅ Finish 16:30
Continue

Lokasi

TJE (Tanjung Enim)

Manpower

Jefri Sukoco
Sultansyah Hakim
Hangger Oktavian Margiansyah (UT School)

Status

Continue

Tanggal

Jumat,
20 Maret 2026

Customer

Pamapersada Nusantara

Detail Unit

DZ657
D375A-6R/P2
S/N : 66306
SAA6D170E-5
E/SN : 616897
HM : 6846 hours

Pekerjaan

TS Front Seal Leak
  • Cek kebocoran
  • Emilado

Time Record

🚚 Depart 13:30
📍 Arrive 15:00
🔧 Start 15:30
✅ Finish 16:30
Monitoring

Lokasi

BTSJ (Banko Tengah Suban Jeriji)

Manpower

Ali Wardana Batubara
Riyan Rivaldi
Sultansyah Hakim

Status

Monitoring

Tanggal

Kamis,
19 Maret 2026

Customer

Pamapersada Nusantara

Detail Unit

DZ1247
D155A-6/P1
S/N : 87956
SAA6D140E-5
E/SN : 635839

Pekerjaan

DZ1247 Ovh
  • Complete T/M (Power Module)
  • Torque Bolt Mounting T/M
  • Install Engine
  • Krida Area Kerja

Time Record

🚚 Depart 07:15
📍 Arrive 07:30
🔧 Start 07:45
✅ Finish 15:00
Continue

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Jefri Andi
Sultansyah Hakim

Status

Continue

Tanggal

Kamis,
19 Maret 2026

Customer

-

Detail Unit

-

Pekerjaan

ReRecoil Spring PC400
  • ReRecoil Spring PC400
  • Loading Track To CT

Time Record

🚚 Depart 06:30
📍 Arrive 07:00
🔧 Start 07:15
✅ Finish 17:00
Continue

Lokasi

TJE (Tanjung Enim)

Manpower

Jefri Sukoco
Dio Prayoga
Muhammad Gilang

Status

Continue

Tanggal

Rabu,
18 Maret 2026

Customer

Pamapersada Nusantara

Detail Unit

Dz1247
D155A-6/P1
S/N : 87956
SAA6D140E-5
E/SN : 635839

Pekerjaan

Ovh
  • Remove engine
  • Re hose oil cooler
  • Re hose blade
  • Re hose after cooler
  • Krida area kerja

Time Record

🚚 Depart 07:15
📍 Arrive 07:30
🔧 Start 07:45
✅ Finish 16:30
Continue

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Ayi Pranata
Sultansyah Hakim

Status

Continue

Tanggal

Rabu,
18 Maret 2026

Customer

-

Detail Unit

-

Pekerjaan

Remove and instal
  • Preparation
  • Cleaning track link
  • Cleaning track shoe
  • Instal track shoe to track link
  • Tightening bolt shoe
  • Conect recoil spring to idler PC400
  • Torq bolt mounting
  • Unloading recoil spring
  • idler from MTBU

Time Record

🔧 Start 07:30
✅ Finish 16:30
Continue

Lokasi

TJE (Tanjung Enim)

Manpower

Dwi Putra Ramadhandy
Firdaus
Muhammad Gilang
Hangger Oktavian Margiansyah (UT School)

Status

Continue

Tanggal

Selasa,
17 Maret 2026

Customer

-

Detail Unit

-

Pekerjaan

Remove and instal
  • Preparation
  • Conect recoil spring to idler PC400
  • Waiting washer
  • Tightening and torq bolt mounting
  • Torq bolt track shoe
  • Tambah 120⁰ bolt track shoe
  • Krida
  • Finish

Time Record

🔧 Start 08:00
✅ Finish 16:30
Continue

Lokasi

TJE (Tanjung Enim)

Manpower

Dwi Putra Ramadhandy
Firdaus
Muhammad Gilang
Hangger Oktavian Margiansyah (UT School)

Status

Continue

Tanggal

Selasa,
17 Maret 2026

Customer

Aiti Mitra Utama

Detail Unit

DZ12
D85E-SS-2/S5
S/N : J20973
S6D125E-2
E/SN : 125110
HM : 9968 hours

Pekerjaan

PPM
  • Preparation
  • Traveling
  • PPM Unit
  • Final Inspection
  • Finish

Time Record

🚚 Depart 10:15
📍 Arrive 10:30
🔧 Start 10:30
✅ Finish 12:30
Ready (RFU)

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Dedi Edison
Ayi Pranata
Zandika Afdilla

Status

Ready (RFU)

Tanggal

Selasa,
17 Maret 2026

Customer

Pamapersada Nusantara

Detail Unit

DZ1247
D155A-6/P1
S/N : 87956
SAA6D140E-5
E/SN : 635839

Pekerjaan

OVH (Contract mechanic)
  • Instal FD LH RH
  • Instal Track Link RH LH
  • Remove Engine Hod
  • Remove Fuel Tank
  • Remove cover"

Time Record

🚚 Depart 08:45
📍 Arrive 07:15
🔧 Start 07:45
✅ Finish 16:30
Continue

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Aldo Trilian Alhadi
Riyan Rivaldi

Status

Continue

Tanggal

Senin,
16 Maret 2026

Customer

-

Detail Unit

-

Pekerjaan

Remove and instal
  • Preparation
  • Cleaning track link
  • Instal track shoe to track link
  • Cleaning track frame
  • Waiting forklift
  • Loading recoil spring
  • Krida
  • Finish

Time Record

🔧 Start 07:00
✅ Finish 16:30
Continue

Lokasi

TJE (Tanjung Enim)

Manpower

Jefri Sukoco
Dwi Putra Ramadhandy
Firdaus
Hangger Oktavian Margiansyah (UT School)

Status

Continue

Tanggal

Senin,
16 Maret 2026

Customer

Pamapersada Nusantara

Detail Unit

DZ1247
D155A-6/P1
S/N : 87956
SAA6D140E-5
E/SN : 635839

Pekerjaan

OVH (Contract Mechanic)
  • Remove bottom guard
  • Remove Cover-cover
  • Washing unit
  • Instal stand
  • Remove mounting FD
  • Remove Track Link

Time Record

🚚 Depart 07:30
📍 Arrive 07:45
🔧 Start 07:45
✅ Finish 16:30
Continue

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Riyan Rivaldi
Zandika Afdilla

Status

Continue