Logo

UNITED TRACTORS

member of Astra

Service Tanjung Enim

MTBU / BTSJ

List Pekerjaan

Daftar pekerjaan yang sudah terinput

+ Tambah Job

Search & Filter

Klik untuk tampilkan atau sembunyikan filter

Tanggal

Kamis,
23 April 2026

Customer

Pamapersada Nusantara

Detail Unit

GR702
GD955-7R/P2
S/N : 50008
SAA6D140E-5
E/SN : 639889
HM : 11045 hours

Pekerjaan

TS Steering System Error
  • - cek error in monitor ( DB3RKR )
  • - cek switch LST4 (OK)
  • - cek relay C36 (OK)
  • - cek power LST1 (OK)
  • - cek Can Bus LST1
  • TM40
  • LST3
  • SAS (OK)
  • - completed cover

Time Record

🚚 Depart 08:00
📍 Arrive 08:00
🔧 Start 08:00
✅ Finish 16:00
Not Completed

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Ali Wardana Batubara
Warijan

Status

Not Completed

Tanggal

Rabu,
22 April 2026

Customer

Aiti Mitra Utama

Detail Unit

EX22-B
PC350LC-8M2
S/N : C92547
SAA6D114E-3
E/SN : 26896615
HM : 4745 hours

Pekerjaan

R&l front seal
  • - Remove old seal
  • - cleaning area front seal
  • - install new seal
  • - completed v belt
  • - completed engine
  • - test running
  • - check blowby and check leak OK
  • - completed and final cehck
  • - check level oil damper (Ok)

Time Record

🚚 Depart 07:45
📍 Arrive 08:05
🔧 Start 08:15
✅ Finish 13:30
Ready (RFU)

Lokasi

BTSJ (Banko Tengah Suban Jeriji)

Manpower

Jaya Pranata
Aldo Trilian Alhadi
Zandika Afdilla

Status

Ready (RFU)

Tanggal

Rabu,
22 April 2026

Customer

-

Detail Unit

EX66
HM : 14 hours

Pekerjaan

DELIVERY UNIT NEW
  • Preparation
  • Install accesories
  • Check all oil level
  • Take data
  • Groundtest
  • Final inspection

Time Record

🚚 Depart 10:00
📍 Arrive 10:10
🔧 Start 10:15
✅ Finish 12:15
Ready (RFU)

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Ali Wardana Batubara
Ayi Pranata
Dio Prayoga
Muhammad Gilang

Status

Ready (RFU)

Tanggal

Rabu,
22 April 2026

Customer

-

Detail Unit

EX60
HM : 1660 hours

Pekerjaan

T/S UNIT CAN'T START
  • Preparation
  • Take data error
  • Check emergency stop
  • Groundtest
  • Final inspection

Time Record

🚚 Depart 08:45
📍 Arrive 09:00
🔧 Start 09:10
✅ Finish 10:10
Ready (RFU)

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Ali Wardana Batubara
Ayi Pranata
Dio Prayoga
Muhammad Gilang

Status

Ready (RFU)

Tanggal

Senin,
20 April 2026

Customer

Aiti Mitra Utama

Detail Unit

EX48
PC350LC-8M2/P1
S/N : C92339
SAA6D114E-3
E/SN : 26896010
HM : 5212 hours

Pekerjaan

R&I CLY BUCKET
  • Preparation
  • Travel
  • Reposisi Unit
  • Remove Hose Cly bucket
  • Replace Oring Hose Cly bucket Buttom side
  • Remove Pin Bucket buttom side & Top side
  • Install Cly Bucket Assy (New)
  • Install Hose
  • Ground Test
  • Final Inspection
  • RFU

Time Record

🚚 Depart 09:30
📍 Arrive 10:00
🔧 Start 10:17
✅ Finish 12:30
Ready (RFU)

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Jaya Pranata
Dio Prayoga
Riyan Rivaldi

Status

Ready (RFU)

Tanggal

Senin,
20 April 2026

Customer

Aiti Mitra Utama

Detail Unit

EX22-B
PC350LC-8M2
S/N : C92547
SAA6D114E-3
E/SN : 26896615
HM : 4743 hours

Pekerjaan

replace front seal engine
  • remove engine fan cover
  • remove ac compressor
  • remove fan
  • remove related part
  • remove damper
  • remove pulley

Time Record

🚚 Depart 09:00
📍 Arrive 09:30
🔧 Start 09:30
✅ Finish 14:32
Not Completed

Lokasi

BTSJ (Banko Tengah Suban Jeriji)

Manpower

Jefri Sukoco
Aldo Trilian Alhadi
Zandika Afdilla

Status

Not Completed

Tanggal

Minggu,
19 April 2026

Customer

Aiti Mitra Utama

Detail Unit

EX22-B
PC350LC-8M2
S/N : C92547
SAA6D114E-3
E/SN : 26896615
HM : 4743 hours

Pekerjaan

TS engine oil leaks from front seal
  • cek engine blow by
  • cek kebocoran oli dari front cover
  • cleaning breather engine

Time Record

🚚 Depart 10:00
📍 Arrive 11:00
🔧 Start 11:30
✅ Finish 14:00
Not Completed

Lokasi

BTSJ (Banko Tengah Suban Jeriji)

Manpower

Jefri Sukoco
Aldo Trilian Alhadi
Zandika Afdilla

Status

Not Completed

Tanggal

Jumat,
17 April 2026

Customer

Aiti Mitra Utama

Detail Unit

EX22-B
PC350LC-8M2
S/N : C92547
SAA6D114E-3
E/SN : 26896615
HM : 4720 hours

Pekerjaan

T/S Engine Leaks
  • Preparation
  • • Travelling
  • • Take data emila
  • • Check error
  • • Blowby high pressure (abnormal)
  • • Check front engine
  • • Check hose blowby (clogging)
  • • Cleaning hose blowby
  • • Check pressure blowby (normal)
  • • Final inspection

Time Record

🚚 Depart 15:00
📍 Arrive 15:50
🔧 Start 16:00
✅ Finish 17:25
Ready (RFU)

Lokasi

BTSJ (Banko Tengah Suban Jeriji)

Manpower

Jaya Pranata
Muhammad Gilang

Status

Ready (RFU)

Tanggal

Kamis,
16 April 2026

Customer

-

Detail Unit

EX65
HM : 13 hours

Pekerjaan

Delivery Unit
  • Install Mirror
  • Final inspection
  • Delivery unit
  • Reporting

Time Record

🚚 Depart 13:00
📍 Arrive 13:20
🔧 Start 13:20
✅ Finish 16:34
Ready (RFU)

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Jefri Sukoco
Dio Prayoga
Riyan Rivaldi

Status

Ready (RFU)

Tanggal

Kamis,
16 April 2026

Customer

-

Detail Unit

EX64
HM : 18 hours

Pekerjaan

Delivery Unit
  • Install Mirror
  • Delivery Unit
  • Final inspection
  • Reporting

Time Record

🚚 Depart 13:00
📍 Arrive 13:20
🔧 Start 13:20
✅ Finish 16:28
Ready (RFU)

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Jefri Sukoco
Dio Prayoga
Riyan Rivaldi

Status

Ready (RFU)

Tanggal

Kamis,
16 April 2026

Customer

-

Detail Unit

PC 400

Pekerjaan

Remove idler
  • Cleaning recoil spring & idler
  • Inspection recoil spring
  • Remove idler
  • Remove piston adjuster
  • Reposisi recoil spring & idler
  • Cleaning area

Time Record

🔧 Start 07:30
✅ Finish 16:00
Not Completed

Lokasi

TJE (Tanjung Enim)

Manpower

Warijan
Aldo Trilian Alhadi

Status

Not Completed

Tanggal

Rabu,
15 April 2026

Customer

-

Detail Unit

DZ18
HM : 8 hours

Pekerjaan

Delivery unit New
  • • preparation
  • • Travelling
  • • Install Blade
  • • Install Accessories
  • • Check All Level Oil
  • • Final Inspection

Time Record

🚚 Depart 08:45
📍 Arrive 09:05
🔧 Start 09:05
✅ Finish 11:30
Ready (RFU)

Lokasi

BTSJ (Banko Tengah Suban Jeriji)

Manpower

Jaya Pranata
Muhammad Gilang
Sultansyah Hakim

Status

Ready (RFU)

Tanggal

Selasa,
14 April 2026

Customer

-

Detail Unit

EX60
HM : 1536 hours

Pekerjaan

PS 1500 HM PMP
  • Ps 1500 pmp
  • Preparation
  • Traveling
  • Waiting unit
  • PERIODIC SERVICE 1500Hours
  • Take sample oil pap all
  • Performance test
  • Final inspection
  • Reporting

Time Record

🚚 Depart 10:45
📍 Arrive 11:40
🔧 Start 12:00
✅ Finish 13:45
Completed

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Aldo Trilian Alhadi
Dio Prayoga
Dwi Putra Ramadhandy
Firdaus

Status

Completed

Tanggal

Senin,
13 April 2026

Customer

-

Detail Unit

EX61
HM : 1045 hours

Pekerjaan

PERIODIC SERVICE 1000 HOURS
  • PREPARATION
  • TRAVELING
  • WAITING UNIT
  • PERIODIC SERVICE 1000H
  • PERFORMANCE TEST
  • FINAL INSPECTION
  • KRIDA AREA KERJA
  • REPORTING

Time Record

🚚 Depart 10:00
📍 Arrive 11:00
🔧 Start 12:00
✅ Finish 14:30
Completed

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Ayi Pranata
Firdaus
Riyan Rivaldi

Status

Completed

Tanggal

Sabtu,
11 April 2026

Customer

Pamapersada Nusantara

Detail Unit

DZ1366
D155A-6/P1
S/N : J10120
SAA6D140E-5
E/SN : 641094
HM : 5292 hours

Pekerjaan

PI BULAN KE 11
  • Preparation
  • Traveling
  • Waiting unit rest time
  • Pi bulan ke 11
  • Finish

Time Record

🚚 Depart 11:30
📍 Arrive 12:00
🔧 Start 12:00
✅ Finish 14:30
Ready (RFU)

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Firdaus
Muhammad Gilang
Sultansyah Hakim

Status

Ready (RFU)

Tanggal

Sabtu,
11 April 2026

Customer

-

Detail Unit

D155A-6R

Pekerjaan

Remove Recoil spring
  • Buang tanah di frame
  • Remove recoil spring
  • Remove nut recoil spring(nut sudah lepas di lapangan)
  • Cleaning area frame
  • Cleaning area kerja
  • frame bawa banyak lumpur
  • Reposisi frame
  • prepare cleaning with water
  • Problem:
  • Solar forklift kritis belum bisa pasang recoil spring
  • Pending aer
  • untuk cleaning frame

Time Record

🔧 Start 08:00
✅ Finish 16:30
Completed

Lokasi

TJE (Tanjung Enim)

Manpower

Jefri Sukoco
Zandika Afdilla

Status

Completed

Tanggal

Jumat,
10 April 2026

Customer

-

Detail Unit

EX58
HM : 3285 hours

Pekerjaan

T/S CONTROL VALVE LEAK
  • • Preparation
  • • Traveling
  • • Test Running
  • • Check Visual Area Control Valve ( Ada Kebocoran Di Hose Discharge Pump To Control Valve
  • • Reoring Hose Discharge Pump To Control Valve
  • • Test Running ( Masih Bocor )
  • • Remove Hose Discharge Pump To Control Valve ( Terdapat Crack Difitting Hose )
  • • Waiting Hose ( 16:00 - 18-00 )
  • • Install Hose New
  • • Test Running ( Aman Tidak Bocor Lagi )
  • • Leveling Oil Hydraulic
  • • Completed
  • • Final Inspection
  • • Krida Area Kerja

Time Record

🚚 Depart 13:30
📍 Arrive 14:00
🔧 Start 14:00
✅ Finish 21:30
Ready (RFU)

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Ali Wardana Batubara
Jefri Sukoco
Firdaus
Riyan Rivaldi

Status

Ready (RFU)

Tanggal

Jumat,
10 April 2026

Customer

Atisi Tangkas Madani

Detail Unit

DZ25
D85E-SS-2/P8
S/N : J21811
S6D125E-2
E/SN : 126985
HM : 758 hours

Pekerjaan

R&I WEARING REAR LAMP
  • Preparation
  • Traveling
  • Waiting
  • Replace WEARING REAR lamp old
  • Install wearing rear lamp new
  • Test performance
  • Final Inspection
  • Krida area kerja

Time Record

🚚 Depart 09:45
📍 Arrive 10:30
🔧 Start 10:30
✅ Finish 13:00
Ready (RFU)

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Firdaus
Muhammad Gilang

Status

Ready (RFU)

Tanggal

Rabu,
08 April 2026

Customer

TRAKA

Detail Unit

EX25-B
PC210-10M0/P1
S/N : C07665
HM : 991 hours

Pekerjaan

Service 1000
  • Preparation
  • Traveling
  • Service 1000
  • Final ispection
  • Finish

Time Record

🔧 Start 13:00
✅ Finish 15:45
Ready (RFU)

Lokasi

BTSJ (Banko Tengah Suban Jeriji)

Manpower

Muhammad Gilang
Sultansyah Hakim
Zandika Afdilla

Status

Ready (RFU)

Tanggal

Rabu,
08 April 2026

Customer

-

Detail Unit

-

Pekerjaan

OVH Gearbox T/M Scania
  • - Disaasy planetary gear
  • - diassy Gearbox
  • - inspection komponen
  • - cleaning Gear korosi

Time Record

🚚 Depart 07:00
📍 Arrive 07:15
🔧 Start 07:30
✅ Finish 17:00
Continue

Lokasi

TJE (Tanjung Enim)

Manpower

Jaya Pranata
Warijan
Dio Prayoga
Jefri Andi

Status

Continue

Tanggal

Rabu,
08 April 2026

Customer

Atisi Tangkas Madani

Detail Unit

DZ26
D85E-SS-2/P8
S/N : J21870
S6D125E-2
E/SN : 127164
HM : 103 hours

Pekerjaan

TS Hour Meter Abnormal
  • Preparation
  • Traveling
  • TS HM abnormal
  • Repair Wiring Hours meter
  • Ground Test
  • Final Inspection
  • Finish

Time Record

🚚 Depart 11:00
📍 Arrive 11:15
🔧 Start 11:15
✅ Finish 12:15
Ready (RFU)

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Dedi Edison
Ali Wardana Batubara
Ayi Pranata

Status

Ready (RFU)

Tanggal

Selasa,
07 April 2026

Customer

-

Detail Unit

EX

Pekerjaan

Instal Idler
  • Preparation
  • Traveling
  • Remove piston
  • Re-seal piston
  • Conect recoil spring to Idler PC400 2x
  • Torqe mounting Idler
  • Final Inspection
  • Finish

Time Record

🚚 Depart 08:15
📍 Arrive 08:45
🔧 Start 09:15
✅ Finish 16:30
Ready (RFU)

Lokasi

TJE (Tanjung Enim)

Manpower

Jaya Pranata
Jefri Sukoco
Dio Prayoga
Jefri Andi
Zandika Afdilla

Status

Ready (RFU)

Tanggal

Senin,
06 April 2026

Customer

-

Detail Unit

-

Pekerjaan

Unloading
  • UNLOADING 4X TELESCOPIC TO WORKSHOP TJE
  • UNLOADING 9X CYLINDER & 1 BOX PARTDI TJE TO CT MOVE KE MTBU

Time Record

🚚 Depart 10:00
📍 Arrive 11:00
🔧 Start 11:00
✅ Finish 15:00
Ready (RFU)

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Firdaus

Status

Ready (RFU)

Tanggal

Minggu,
05 April 2026

Customer

-

Detail Unit

EX57
HM : 3563 hours

Pekerjaan

R&I Supply pump ( replace oring mounting)
  • Preparation
  • traveling
  • remove supply pump & related part
  • cleaning supply pump & engine area
  • install supply pump & related part
  • ground test
  • final check
  • RFU

Time Record

🚚 Depart 09:00
📍 Arrive 10:00
🔧 Start 10:00
✅ Finish 18:30
Ready (RFU)

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Ali Wardana Batubara
Muhammad Gilang
Riyan Rivaldi
Sultansyah Hakim

Status

Ready (RFU)

Tanggal

Kamis,
02 April 2026

Customer

Pamapersada Nusantara

Detail Unit

GR653
GD825A-2/P4
S/N : 13709
S6D140E-2
E/SN : 44902
HM : 5242 hours

Pekerjaan

PAP HYD SOS
  • Preparation
  • waiting unit washing
  • Take PAP sample
  • Drain Hyd Tank
  • Clean Hyd Tank
  • Replace Strainer & Filter
  • Fill Hyd Tank
  • Ground Test
  • Final Check
  • RFU

Time Record

🚚 Depart 08:00
📍 Arrive 08:15
🔧 Start 13:00
✅ Finish 16:00
Monitoring

Lokasi

MTBU (Muara Tiga Besar Utara)

Manpower

Ali Wardana Batubara
Muhammad Gilang

Status

Monitoring

MENU